Estimate concrete volume and bag quantities for rectangular slabs or round columns using manufacturer yield.
Calculated on your device
Enter your values
YOUR ANSWER
Results
Select Calculate to see results.
Calculation steps
Calculate to see the steps for your inputs; the worked example below is available without JavaScript.
Worked example
A 3 m × 2 m × 0.1 m slab is 0.6 m³. With 10% extra it needs 660 L; at 12 L per bag, buy 55 bags.
How to use this calculator
Use consistent dimension units. Enter the actual mixed-volume yield from the bag label, not bag weight. This estimates material quantity, not structural design or suitability.
Displayed values are rounded. Calculations support education and general planning.
A 3 m × 4 m slab at 0.1 m depth needs 1.2 m³ before allowance. Doubling depth doubles volume.
Assumptions and common mistakes
Use bag yield, not dry bag weight, to calculate bag count. Uneven ground, reinforcement, delivery increments, and structural design need separate assessment.
Use the worked example above to check the input convention before entering your own values. Displayed decimals are rounded; extra digits do not increase the precision of your measurements. Read about calculation accuracy and corrections.